Vote Passed
Scheffel Boyle accounting has reported on the recent question to DLPOA members of whether to raise assessments to $675 this year and then an additional $175 per year over the next 3 years to an annual amount of $1,200. An assessment increase requires a simple majority of 51% to pass.
With 558 votes cast:
YES – 366 (66%)
NO – 192 (34%)
The proposal passed.
The DLPOA board and committees will be meeting regularly to begin work on the first phase of improvements to the Dam and Spillway.
Zoom Q&A from Monday April 12
The lake needs your support
At the Feb. 18 Annual Meeting, the Dunlap Lake Property Owner’s Association presented a proposal asking residents to fund maintenance for the 80 year-old dam and capital improvement projects to protect the lake.
What projects are being considered?
A variety of projects are outlined in the Master Plan, but the current major capital projects are:
Dam and Spillway
Estimated Cost: $473,000
The IDNR has mandated the spillway be tripled in size, and the damn has additional overdue maintenance. Here is the project spotlight.
Water Quality Capital Projects
Dewatering Pond
Estimated Cost: $1,746,000
Excavating 50,000 cubic yards at the property at 840 East Lake, and adding pipes to the lake from there. Here is the project spotlight.
Sediment Basin
Estimated Cost: $883,000
Removing silt from the area near the intake at East Lake and Gerber, using a dredging barge, to the dewatering pond, and preparing the area to trap incoming silt. Here is the project spotlight.
Recurring Silt Removal Operations
Estimated Cost: $200,000 – $500,000, recurring every 3-5 years as funds accumulate.
After silt in dewatering pond has dried, it will be excavated and refilled by another dredging barge operation. Cost will depend on if our dried silt is fit for sale.
Why do we need to do this?
A natural part of any lake that is a dammed watershed is silt fill in. This must be accounted for in the lake maintenance plan. Our lake is very far behind in this maintenance. The lake becomes noticeably more shallow every year. Notable problems from this decreased water volume and increased silt include:
The spillway improvements have been strongly advised by Illinois Department of Natural Resources. If we don’t comply they will probably force us to.
- Water clarity is decreased.
- Boat cruising routes become shorter and increasing areas of the lake, including existing docks, become unusable.
- Dangerous algae blooms make it unsafe to swim or even boat.
- Fishing is less effective and less safe to eat.
- Property values are affected.
FAQ
What other water quality options were considered?
While there are many methods to improve general water quality, research quickly determines that no solution produces a small fraction of the results as simply removing silt. There is just no substitute for that, so removing the silt must be done first.
Mechanical excavation was determined to be less cost effective than dredging.
Eco Bags and trucking wet silt out of the area were considered and determined to be less cost effective than building a dewatering pond.
Owning and operating our own barge was explored and found to be expensive and a dangerous liability.
How can we be confident the new funds will go towards these capital projects?
- These projects have been developed over many years and many boards. We have also had a significant amount of preliminary engineering completed for the needed projects. The current board is unanimous about the necessity and urgency of these projects.
- Board financials are transparent and posted regularly.
- Staggered, rotating board terms provide board continuity from year to year.
Don't we already have a silt retention basin?
Yes, it was built in 2009 and is nearly 100% full. This project uses the existing basin by removing the accumulated silt, as designed, then expands the basin significantly.
Will fees go back down after 2024?
They will remain at $1200 per year until the membership votes to change them again. Between inflation and recurring silt removal operations, we don’t expect the fiscal need to diminish.
More Resources
Related Posts
Final Ballot Count
Ballot Count is Final Scheffel Boyle accounting has reported on the recent question to DLPOA members of whether to raise assessments to $675 this year and then an additional $175 per year over the next 3 years to an annual amount of $1,200 An assessment increase...
Ballots Must Be Postmarked by April 30th
REMINDER - please return your ballots; they must be postmarked by April 30th. It's extremely important to make your voice heard and vote today on the proposal for funding to maintain and protect our lake. Now is the time to take action. The Ballots have been mailed....
Capital Improvement Project 3 – Sediment Basin
This is the third in a series of articles on project priorities from the Dunlap Lake 20-Year Master Plan. It has been recommended that the Association build a catch basin with berms to slow down the flow of incoming water and allow sediment to drop out of the water...
Capital Improvement Project 2 – Dewatering Pond
This is the second in a series of articles on project priorities from the Dunlap Lake 20-Year Master Plan. The second capital priority listed in the Dunlap Lake Master Plan is digging out a pond with a special drain system at the bottom so that material removed from...
Capital Improvement Project 1- Updating the Dam’s Spillway
This is the first in a series of articles on project priorities from the Dunlap Lake 20-Year Master Plan. The top priority identified is updating the spillway on the 80-year old dam. With storm events and impervious surfaces increasing water flow everywhere, IDNR...
Characteristics of a Community Association
Here at Dunlap Lake, we are a part of a unique planned community with wonderful natural resources. Working together we can continue to be one of the most sought-after communities in the region for decades to come.
IDNR Requested Expansion of Spillway
DLPOA is asking residents –
to raise fees $15 per month to fund maintenance for the 80-year-old dam and keep silt and pollution out of the lake. Increasing water flows are hitting WWII-era infrastructure and everyone who owns property in the association shares this liability. Mike Watts, DLPOA...
Aerial Photos
Dunlap Lake was created by blocking Mooney Creek with a 30 x 700 foot earthen dam. These aerial photos from Madison County show how the valley has changed since 1941.
Questions or Comments
Give us your questions and we will answer them in person and/or post them on this page. You can even ask anonymously, none of these fields are required.